Starting from on-site survey we gather accurate
information about the physical requirements of the BSC
location in the switching room, including rack space
cabling and power requirements to insure that all correct
equipment and connection are available for installation.
Then we install and commission the BSC integrating it
with MSC and SGSN. Recently we have installed and
commissioned Huawei BSC-6000 passing through TC
cabinet towards main MSC for Ufone in Islamabad and
integrated it with M-2000 server.